User Tools

Site Tools


user:mgough:labshelves

Rearrange and Organize the student.lab Shelves

Mike Gough & Jamie Brandt

Rearrange the computers. organize the wiring, and document the layout of the student.lab shelving area.

Tidieness is next to godliness they say, well if that were the case, the lab shelves would be “down below” as they say (No offense to anybody that worked on it before!).

The servers were re-ordered per Matt's instructions with a total de-wiring of the entire shelving area. We attached the power strips to the back of the shelves in more suitable locations for cabling purposes.

The cabling routing was changed and all cables were wire-tied and organized.

My goal is to put up an autocad drawing of the wall, but I've ran into technical export issues. Here is the final layout

Rack 0 (Located against the wall)

Server	KVM /Port    switch/port	Power source

Top shelf

UPS			wall power
Lamarr	0/3	5 port switch	ups
ahhcobras	0/2	5 port switch	ups
koolaid	0/1	5 port switch	ups
5 port switch			ups
		

Second shelf

KVM 0			Strip 0
KVM 1			Strip 0
Switch 0		Port 23  connected to koolaid	Strip 0
		

Third shelf

VM1	1 / 5	0 / 1	Strip 1
VM2	1 / 6	0 / 2	Strip 1
VM3	1 / 7	0 / 3	Strip 1
VM4	1 / 8	0 / 4	Strip 1
		

Bottom shelf

VM5	0 / 5	0 / 5	Strip 2
VM6	0 / 6	0 / 6	Strip 2
VM7 	0 / 7	0 / 7	Strip 2
VM8	0 / 8	0 / 8	Strip 2
		

Rack 1

Top shelf	 		
C00	2 / 1	1 / 1	
C01	2 / 2	1 / 2	
C02	2 / 3	1 / 3	
C03	2 / 4	1 / 4	
		

Second shelf

KVM02			
KVM03			
Switch 1			
		

Third shelf

C04	2 / 5	1 / 5	
C05	2 / 6	1 / 6	
C06	2 / 7	1 / 7	
C07	2 / 8	1 / 8	
		

Forth shelf

G0	3 / 8	1 / 9	
G1	3 / 7	1 / 10	
G2	3 / 6	1 / 11	
G3	3 / 5	1 / 12	

Fifth shelf

S10	3 / 3	1 / 16	
GS	3 / 4	g  	
user/mgough/labshelves.txt · Last modified: 2010/05/20 20:53 by mgough