Week One (1/20-1/23)
Complete dsi0 due Wednesday 1/28.
- reviewing C/C++ programming
- a lot of stuff to do
- single program
- good luck
Data structure directory
- src/data
Systems Programming Journal
Week One (1/20-1/23)
Project to recreate 8-bit game
- Donkey Kong
- SDL v.2
- lazyfoo for SDL guide
- Github.org (justgolden07)
- repo danshadeck/spg1
Project directory (lab 46)
- src/sysprog
- spg1
- git pull- pull updates
- git add file- when changing something
- git commit -m “commit message” when committing
- git push- push changes
- git status- check for changes
Week two (1/26-1/30)
Donkey Kong
- Goals
- create basic images for map
- get window to stay up
- look and pick out part of code we need for game
- understand the comments and take out whatever we dont need
- Accomplished
- created map (floors, ladders, and characters)
- window stays open
- cleared out unneeded code and understand what we have and what it does
- Next week goals
- movement for Mario with keyboard, maybe controller
- possible implement jumping and gravity
Week 3 (2/2-2/6)
- Goals
- movement
- Accomplished
- movement
- Next Goal
- Add some graphics
Week 4 (2/9-2/13)
- Goal
- add graphics to some current images
- Accomplished
- imported images of Mario, Donkey Kong, and Peach
- Next Goal
- movement on ladders
Week 5 (2/16-2/20)
- Goals
- meet over break to work on code
- get ladderflag working
- Accomplished
- met twice
- added end game credits and win condition
- Next Goal
- figure out how to make ladderflag work with all floors and allow to go back down
Week 6 (2/23-2/27)
- Goal
- still fix ladderflag
- Accomplished
- added suicide prevention from falling off floors
- Next goal
- ladderflag changed to a struct but still needs fix
Week 7 (3/2-3/6)
- Goal
- fix ladderflag
- finish as much as the game as possible for “submission”
- Accomplished
- make a separate copy to clean out older parts of code that we are no longer using to help see the rest of the code more clear
- Next Goal
- Last thing to add: Barrels, ladderflag, collision detection, jumping
Week 8 (3/9-3/13)
- Goal
- Donkey Kong put to rest
- new game started in liar space
- learn branching
- Accomplished
- set up repo and concept of the game
- Next Goal
- Start the game
Week 9 (3/16-3/20)
- Goal
- Collaborate and start making parts of the game
- Accomplished
- Nothing
- Next Goal
- TBD
Week 10 (3/23-3/27)
- Goal
- Get a clear direction on where we want to head
- Accomplished
- Next Goal
- TBD
Week 11 (4/6-4/10)
- Stop production on game and actually have a class to learn the processes of the OS
- Man readdir
- Mam opendir
- Man 2 stat
- Program
- dir.c
- stat.c
Week 12 (4/13-4/17)
- EOCE opened
- Program
- getopt.c
Week 13 (4/20-4/24)
- work on eoce
Week 13 (4/20-4/24)
- work on eoce
- thread.c
Week 14 (4/27-5/1)
- talked about Trees
- next week class will be for working on eoce