User Tools

Site Tools


Sidebar

projects

wcp1 (due 20240828)
btt0 (due 20240904)
wcp2 (due 20240904)
pct0 (bonus; due 20240905)
pct1 (bonus; due 20240905)
pct2 (due 20240905)
abc0 (due 20240906)
msi0 (due 20240911)
pct3 (bonus; due 20240911)
wcp3 (due 20240911)
msi1 (due 20240918)
pct4 (due 20240918)
wcp4 (due 20240918)
msi2 (due 20240926)
pct5 (bonus; due 20240926)
wcp5 (due 20240926)
gfo0 (due 20241002)
msi3 (due 20241002)
pct6 (due 20241002)
wcp6 (due 20241002)
cgf0 (due 20241009)
pct7 (bonus; due 20241009)
wcp7 (due 20241009)
bwp1 (bonus; due 20241016)
cgf1 (due 20241016)
pct8 (due 20241016)
wcp8 (due 20241016)
cgf2 (due 20241023)
pct9 (bonus; due 20241023)
wcp9 (due 20241023)
gfo1 (due 20241030)
mag0 (due 20241030)
pctA (due 20241030)
wcpA (due 20241030)
mag1 (due 20241106)
pctB (bonus; due 20241106)
wcpB (due 20241106)
mag2 (due 20241113)
pctC (due 20241113)
wcpC (due 20241113)
pctD (bonus; due 20241120)
wcpD (bonus; due 20241120)
bwp2 (bonus; due 20241204)
gfo2 (due 20241204)
pctE (bonus; due 20241204)
wcpE (bonus; due 20241204)
EoCE (due 20241216)
haas:fall2024:data:projects:dka0:metrics

dka0 Project Class Status Summary

Provided as a means of better understanding trends, the following charts and tables will visualize various indirect data points that, while not indicative of success (or deferrance thereof), may well correlate with such. Plus, being able to see trends on a large scale can aid in better decision making and planning.

dka0 lifespan

Projects are typically released on Tuesday, and are due by the end of the following Wednesday. This allows for at least nine days to work on the project without penalty.

Following the due date, there is a period of three days (the late, or past due period), where 25% is docked each day, after which the project neither has nor can earn any value.

Here is a table with the pertinent dates for this project (the day number is the one that is also found on the x-axis of the graphs).

20171005 20171006 20171007 20171008
0 1 2 3 (TODAY)
start date late day 1 (25% off) late day 2 (50% off) late day 3 (75% off)

Typically, any and all activity taking place to the left of the due date is preferable; it tends to indicate less procrastination and has the likelihood of involving better time management.

Progress By Day (Individual)

<charter> title = dka0 Individual Progress size = 600×400 align = center type = bar XAxisName = Day YAxisName = Activity Level shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

72,0,0,0 156,0,0,0 135,0,0,0 105,0,0,0 4,0,0,0 117,0,0,0 51,0,0,0 13,0,0,0 104,0,0,0 0,0,0,0 115,0,0,0 79,0,0,0 110,0,0,0 310,0,0,0 70,0,0,0 70,0,0,0 114,0,0,0 </charter>

Each line represents an individual class member's progress on the project. The more active they are, the higher the bar will rise.

The busier the day looks, the more active a development day it is by more of the class. And the more left shifted the activity, the less procrastination (lefterer is betterer).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Progress toward Completion (Individual)

<charter> title = dka0 Individual Completion Progress size = 600×400 align = center type = line XAxisName = Day YAxisName = Correct Unit Test Results shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 0,0,0,0 </charter>

Each line represents the progress of a class member toward full implementation (as defined by the unit tests performed during a 'make check'). The higher the line, the more unit tests are being passed.

The busier the day looks, the more active a development day it is by more of the class. And the more left shifted upward activity starts, the better (as it shows work is well underway).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Progress By Day and Quantity (Together)

<charter> title = dka0 Class and Quantity Progress size = 600×400 align = center type = barStacked XAxisName = Day YAxisName = Activity Level shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

72,0,0,0 156,0,0,0 135,0,0,0 105,0,0,0 4,0,0,0 117,0,0,0 51,0,0,0 13,0,0,0 104,0,0,0 0,0,0,0 115,0,0,0 79,0,0,0 110,0,0,0 310,0,0,0 70,0,0,0 70,0,0,0 114,0,0,0 </charter>

Each bar represents the total class activity on the project for the given day. The higher and more colorful the bar, the more activity by more people took place (upperer as well as lefterer is betterer).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Class Member Activity Per Day

<charter> title = dka0 Class Progress size = 600×400 align = center type = barStacked XAxisName = Day YAxisName = Activity Level shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 0,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 10,0,0,0 </charter>

Each day shows the quantity of project builds per day of the project's lifespan.

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. As such, the lefterer and upperer the betterer.

NOTE: Activity is measured in units of a user performing build activities on the project, and counted up to one time per user per day.

Project Lifecycle Stats (Individual)

<charter> title = dka0 Individual Project Duration size = 600×400 align = center type = bar XAxisName = Person YAxisName = Minutes shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

108 527201 111 98 3779 3799 191 530658 3799 0 530816 88 85 106 180 103 83 192 </charter>

Each bar represents the number of minutes taken from initial upgrade to project through project submission (final submission).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Obtains/Upgrades/Updates/Submits By Day

<charter> title = dka0 Lifecycle Progress size = 600×400 align = center type = barStacked legendEntries = obtain, upgrade, update, submit XAxisName = Day YAxisName = Activity shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

170,0,0,0 0,0,0,0 0,0,0,0 130,0,0,0 </charter>

Each day shows the quantity of project obtains, upgrades, revision updates, and submissions per day of the project's lifespan.

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. As such, the lefterer and upperer the betterer.

NOTE: Activity is measured in units of specific actions taken (upgrading, submitting, etc.), and counted once per user per day.

Status Page last updated: Sun Oct 8 02:43:35 EDT 2017

haas/fall2024/data/projects/dka0/metrics.txt · Last modified: 2017/10/08 06:43 by 127.0.0.1