User Tools

Site Tools


Sidebar

projects

  • uxi0 (due 20160127)
  • arc0 (due 20160203)
  • pbx0 (due 20160210)
  • pbx1 (due 20160224)
  • wpa0 (due 20160302)
  • cus0 (due 20160309)
  • udr0 (due 20160316)
  • udr1 (due 20160323)
  • udr2 (due 20160406)
  • upr0 (due 20160413)
  • gfo0 (due 20160420)
haas:spring2016:unix:projects:status

This is an old revision of the document!


UNIX/Linux Fundamentals Fall 2015 Status

Data and visualizations generated from class activity.

This information is provided to give you a better perspective on how the class as a whole is trending.

Numeric Stats on Deliverables

=========================================================================
UNIX    uxi0 arc0 pbx0 pbx1   got+bns/totl  avg prjct+attnd+jrnal= result
=========================================================================
lowscore: 62    0    0    0    ..........  12  .................  41 
avgscore: 81%  68%  83%  75%   .......... 109  .................  96 
 hiscore:100  100  100  100    .......... 177  ................. 127 
  median: 81   75  100  100  
    mode:100  100,75 100  100  
   range: 38  100  100  100  
========================================================================
# passed: 14   13   17   15    ..........  16  .................  18 
 # of As:  7    5   14   15    ..........  15  .................  14 
 # of Bs:  3    3    0    0    ..........   0  .................   1 
 # of Cs:  4    5    3    0    ..........   1  .................   3 
 # of Ds:  0    0    0    0    ..........   0  .................   0 
 # of Fs:  6    7    3    5    ..........   4  .................   2 
# submit: 20   17   18   15  
  # late:  0    1    5    5  
% passed: 70%  65%  85%  75% 
 % of As: 35%  25%  70%  75% 
 % of Bs: 15%  15%   0%   0% 
 % of Cs: 20%  25%  15%   0% 
 % of Ds:  0%   0%   0%   0% 
 % of Fs: 30%  35%  15%  25% 
% submit:100%  85%  90%  75% 
  % late:  0%   5%  25%  25% 
========================================================================

Class Project Progress

<charter> title = Class Project Progress size = 600×400 align = center type = cubic XAxisName = Project YAxisName = Result shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 legendEntries = Upper Bound, Lower Bound, Low Score, Average Score, High Score, Median Score, Mode Score, Submit, Late graphLabels = 2|0|uxi0, 2|1|arc0, 2|2|cus0, 2|3|pbx0, 2|4|pbx1, 2|5|wpa0, 2|6|udr0

125,125,125,125,125,125,125 -25,-25,-25,-25,-25,-25,-25 0,0,0,50,100,0,0 83,57,65,95,100,68,65 100,100,100,100,100,100,100 100,66,89,100,100,100,80 100,66,89,100,100,100,100 90,81,72,100,100,72,72 9,0,27,0,0,9,0 </charter>

The class project progress graph visualizes the distilled results (low, average, high, median, mode, submit, late) for each project, allowing big picture view of how the class is progressing.

haas/spring2016/unix/projects/status.1456756651.txt.gz · Last modified: 2016/02/29 14:37 by wedge