User Tools

Site Tools


Sidebar

projects

  • uxi0 (due 20160127)
  • arc0 (due 20160203)
  • pbx0 (due 20160210)
  • pbx1 (due 20160224)
  • wpa0 (due 20160302)
  • cus0 (due 20160309)
  • udr0 (due 20160316)
  • udr1 (due 20160323)
  • udr2 (due 20160406)
  • upr0 (due 20160413)
  • gfo0 (due 20160420)
haas:spring2016:unix:projects:status

UNIX/Linux Fundamentals Fall 2015 Status

Data and visualizations generated from class activity.

This information is provided to give you a better perspective on how the class as a whole is trending.

Numeric Stats on Deliverables

==================================================================================================
UNIX    uxi0 arc0 pbx0 pbx1 wpa0 cus0 udr0 udr1 udr2   got+bns/totl  avg prjct+ptcpn+jrnal= result
==================================================================================================
lowscore: 62    0    0    0    0    0    0    0    0    ..........   2  .................   6 
avgscore: 81%  68%  83%  75%  63%  58%  57%  35%  27%   ..........  60  .................  66 
 hiscore:100  100  100  100  100  100  100  100  100    .......... 115  .................  95 
  median: 81   75  100  100   75   76   84    1    0  
    mode:100  100  100  100  100  100    0    0    0  
   range: 38  100  100  100  100  100  100  100  100  
=================================================================================================
# passed: 14   13   17   15   14   12   12    7    4    ..........   9  .................  14 
 # of As:  7    5   14   15    9    9    8    4    3    ..........   4  .................   2 
 # of Bs:  3    3    0    0    0    0    3    0    0    ..........   3  .................   7 
 # of Cs:  4    5    3    0    4    2    1    2    1    ..........   0  .................   4 
 # of Ds:  0    0    0    0    1    1    0    1    0    ..........   2  .................   1 
 # of Fs:  6    7    3    5    6    8    8   13   16    ..........  11  .................   6 
# submit: 20   17   18   15   14   13   14   10    9  
  # late:  0    1    5    5   10    9    9   11   15  
% passed: 70%  65%  85%  75%  70%  60%  60%  35%  20% 
 % of As: 35%  25%  70%  75%  45%  45%  40%  20%  15% 
 % of Bs: 15%  15%   0%   0%   0%   0%  15%   0%   0% 
 % of Cs: 20%  25%  15%   0%  20%  10%   5%  10%   5% 
 % of Ds:  0%   0%   0%   0%   5%   5%   0%   5%   0% 
 % of Fs: 30%  35%  15%  25%  30%  40%  40%  65%  80% 
% submit:100%  85%  90%  75%  70%  65%  70%  50%  45% 
  % late:  0%   5%  25%  25%  50%  45%  45%  55%  75% 
=================================================================================================

Class Project Progress

<charter> title = Class Project Progress size = 600×400 align = center type = cubic XAxisName = Project YAxisName = Result shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 legendEntries = Upper Bound, Lower Bound, Low Score, Average Score, High Score, Median Score, Mode Score, Submit, Late graphLabels = 2|0|uxi0, 2|1|arc0, 2|2|pbx0, 2|3|pbx1, 2|4|wpa0, 2|5|cus0

125,125,125,125,125,125 -25,-25,-25,-25,-25,-25 62,0,0,0,0,0 81,68,83,75,63,58 100,100,100,100,100,100 81,75,100,100,75,76 100,75,100,100,100,100 100,85,90,75,70,65 0,5,25,25,50,45 </charter>

The class project progress graph visualizes the distilled results (low, average, high, median, mode, submit, late) for each project, allowing big picture view of how the class is progressing.

haas/spring2016/unix/projects/status.txt · Last modified: 2016/04/12 13:03 by wedge