User Tools

Site Tools


Sidebar

projects

dsi0 (20170826)
wcp1 (20170826)
ael0 [faq] (20170830)
wcp2 (20170902)
sln0 [faq] (20170906)
wcp3 (20170909)
sln1 [faq] [metrics] (20170913)
wcp4 (20170916)
sll0 [faq] [metrics] (20170920)
wcp5 (20170923)
sll1 [faq] [metrics] (20170927)
wcp6 (20170930)
sll2 [faq] [metrics] (20171004)
wcp7 (20171007)
sll3 [faq] [metrics] (20171018)
sll4 [faq] [metrics] (20171018)
wcp8 (20171021)
dln0 [faq] [metrics] (20171025)
dll0 [faq] [metrics] (20171025)
wcp9 (20171028)
dll1 [faq] [metrics] (20171101)
wcpA (20171104)
dll2 [faq] [metrics] (20171108)
dls0 [faq] [metrics] (20171108)
wcpB (20171111)
dlq0 [faq] [metrics] (20171115)
wcpC (20171118)
dlt0 [faq] [metrics] (20171129)
haas:fall2017:data:projects:sln1:metrics

sln1 Project Class Status Summary

Provided as a means of better understanding trends, the following charts and tables will visualize various indirect data points that, while not indicative of success (or deferrance thereof), may well correlate with such. Plus, being able to see trends on a large scale can aid in better decision making and planning.

sln1 lifespan

Projects are typically released on Tuesday, and are due by the end of the following Wednesday. This allows for at least nine days to work on the project without penalty.

Following the due date, there is a period of three days (the late, or past due period), where 25% is docked each day, after which the project neither has nor can earn any value.

Here is a table with the pertinent dates for this project (the day number is the one that is also found on the x-axis of the graphs).

20170829 20170830 20170831 20170901 20170902 20170903 20170904 20170905 20170906 20170907 20170908 20170909 20170910 20170911 20170912 20170913 20170914 20170915 20170916
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
start date due date late day 1 (25% off) late day 2 (50% off) late day 3 (75% off)

Typically, any and all activity taking place to the left of the due date is preferable; it tends to indicate less procrastination and has the likelihood of involving better time management.

Progress By Day (Individual)

<charter> title = sln1 Individual Progress size = 600×400 align = center type = bar XAxisName = Day YAxisName = Activity Level shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

0,0,0,0,0,0,0,1,138,21,3,0,0,0,0,0,0,0,0 30,0,0,0,0,0,0,0,0,143,97,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,23,102,1,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,108,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,11,0,2,8,0,277,57,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,77,73,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,24,0,8,0,0 0,0,0,0,0,0,0,1,0,4,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,2,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 24,89,23,0,0,0,0,24,9,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,1,0,0,0,0,0,0,2,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,144,65,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,29,79,9,0,0,0 0,0,0,0,0,0,0,0,0,0,96,0,69,41,73,442,1,0,0 0,0,0,0,0,0,0,0,0,109,86,3,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,228,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,39,12,0,0 </charter>

Each line represents an individual class member's progress on the project. The more active they are, the higher the bar will rise.

The busier the day looks, the more active a development day it is by more of the class. And the more left shifted the activity, the less procrastination (lefterer is betterer).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Progress toward Completion (Individual)

<charter> title = sln1 Individual Completion Progress size = 600×400 align = center type = line XAxisName = Day YAxisName = Correct Unit Test Results shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

0,0,0,0,0,0,0,0,11,11,11,11,11,11,11,11,11,11,11 11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11 0,0,0,0,0,0,0,0,0,0,0,0,0,0,7,11,11,11,11 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,4,4,4,4 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,11,11,11,11,11 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11,11 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,11,11,11,11,11 0,0,0,0,0,0,0,0,0,0,0,0,0,11,11,11,11,11,11 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,10,11,11,11 0,0,0,0,0,0,0,0,0,4,11,11,11,11,11,11,11,11,11 0,0,0,0,0,0,0,0,0,11,11,11,11,11,11,11,11,11,11 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 </charter>

Each line represents the progress of a class member toward full implementation (as defined by the unit tests performed during a 'make check'). The higher the line, the more unit tests are being passed.

The busier the day looks, the more active a development day it is by more of the class. And the more left shifted upward activity starts, the better (as it shows work is well underway).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Progress By Day and Quantity (Together)

<charter> title = sln1 Class and Quantity Progress size = 600×400 align = center type = barStacked XAxisName = Day YAxisName = Activity Level shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

0,0,0,0,0,0,0,1,138,21,3,0,0,0,0,0,0,0,0 30,0,0,0,0,0,0,0,0,143,97,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,23,102,1,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,108,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,11,0,2,8,0,277,57,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,77,73,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,24,0,8,0,0 0,0,0,0,0,0,0,1,0,4,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,2,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 24,89,23,0,0,0,0,24,9,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,1,0,0,0,0,0,0,2,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,144,65,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,29,79,9,0,0,0 0,0,0,0,0,0,0,0,0,0,96,0,69,41,73,442,1,0,0 0,0,0,0,0,0,0,0,0,109,86,3,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,228,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,39,12,0,0 </charter>

Each bar represents the total class activity on the project for the given day. The higher and more colorful the bar, the more activity by more people took place (upperer as well as lefterer is betterer).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Class Member Activity Per Day

<charter> title = sln1 Class Progress size = 600×400 align = center type = barStacked XAxisName = Day YAxisName = Activity Level shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

0,0,0,0,0,0,0,10,10,10,10,0,0,0,0,0,0,0,0 10,0,0,0,0,0,0,0,0,10,10,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,10,10,10,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,10,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,10,0,10,10,0,10,10,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,10,10,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,10,0,10,0,0 0,0,0,0,0,0,0,10,0,10,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,10,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 10,10,10,0,0,0,0,10,10,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,10,0,0,0,0,0,0,10,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,10,10,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,10,10,10,0,0,0 0,0,0,0,0,0,0,0,0,0,10,0,10,10,10,10,10,0,0 0,0,0,0,0,0,0,0,0,10,10,10,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,10,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,10,10,0,0 </charter>

Each day shows the quantity of project builds per day of the project's lifespan.

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. As such, the lefterer and upperer the betterer.

NOTE: Activity is measured in units of a user performing build activities on the project, and counted up to one time per user per day.

Project Lifecycle Stats (Individual)

<charter> title = sln1 Individual Project Duration size = 600×400 align = center type = bar XAxisName = Person YAxisName = Minutes shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

2882 25379 11935 15268 0 9026 13810 15245 15268 15268 25329 11688 15268 11938 7229 12419 6536 3579 12369 </charter>

Each bar represents the number of minutes taken from initial upgrade to project through project submission (final submission).

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing.

Obtains/Upgrades/Updates/Submits By Day

<charter> title = sln1 Lifecycle Progress size = 600×400 align = center type = barStacked legendEntries = obtain, upgrade, update, submit XAxisName = Day YAxisName = Activity shadow = on titleColor = #efefef scaleColor = #efefef shadowColor = #000 bggradient = #333@50 graphGradient = #666@50 fontLegend = VeraMono.ttf@8 graphLabels =

30,0,0,0,0,0,0,160,0,40,0,0,0,0,0,20,10,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 0,0,10,0,0,0,0,0,10,40,0,10,0,0,10,60,10,0,0 </charter>

Each day shows the quantity of project obtains, upgrades, revision updates, and submissions per day of the project's lifespan.

Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. As such, the lefterer and upperer the betterer.

NOTE: Activity is measured in units of specific actions taken (upgrading, submitting, etc.), and counted once per user per day.

Status Page last updated: Sun Sep 17 02:36:26 EDT 2017

haas/fall2017/data/projects/sln1/metrics.txt · Last modified: 2017/09/17 06:36 by 127.0.0.1