User Tools

Site Tools


haas:fall2016:discrete:projects:wpf9

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
haas:fall2016:discrete:projects:wpf9 [2016/10/30 14:59] – [Puzzle] wedgehaas:fall2016:discrete:projects:wpf9 [2016/10/30 22:47] (current) – [Objective] wedge
Line 16: Line 16:
 Remember, keeping track of what has been eliminated is just as important as tracking what has been identified. A lot of trouble or dead ends emerged when people were not keeping full inventory on grid box eliminations. Remember, keeping track of what has been eliminated is just as important as tracking what has been identified. A lot of trouble or dead ends emerged when people were not keeping full inventory on grid box eliminations.
  
-This one should not be too much more challenging than last week'puzzle; be sure to check for secondary and tertiary connectionsIf you run through the clues and sense you don't have enough to proceed, you're missing a secondary connection from cross-referencing clues already placed on the grid. +I found this one enjoyably more challenging than last week'logic gridNot annoyingly hard- just need to cross-check things, and be very aware of the indirect relationships that pop up.
 ====Puzzle Backstory==== ====Puzzle Backstory====
  
haas/fall2016/discrete/projects/wpf9.1477839568.txt.gz · Last modified: 2016/10/30 14:59 by wedge