This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
haas:fall2015:data:projects:sll0:metrics [2015/09/30 23:19] – created wedge | haas:fall2015:data:projects:sll0:metrics [2015/10/13 20:39] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | s | + | ======sll0 Project Class Status Summary====== |
+ | |||
+ | Provided as a means of better understanding trends, the following charts and tables will visualize various indirect data points that, while not indicative of success (or deferrance thereof), may well correlate with such. Plus, being able to see trends on a large scale can aid in better decision making and planning. | ||
+ | |||
+ | =====sll0 lifespan===== | ||
+ | Projects are typically released on Tuesday, and are due by the end of the following Wednesday. This allows for at least nine days to work on the project without penalty. | ||
+ | |||
+ | Following the due date, there is a period of three days (the late, or past due period), where 25% is docked each day, after which the project neither has nor can earn any value. | ||
+ | |||
+ | Here is a table with the pertinent dates for this project (the day number is the one that is also found on the x-axis of the graphs. | ||
+ | |||
+ | ^ 20150922 | ||
+ | | 0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | | ||
+ | ^ start date ^ ^ ^ ^ ^ ^ ^ ^ due date ^ late day 1 (25% off) ^ late day 2 (50% off) ^ late day 3 (75% off) | | ||
+ | |||
+ | Typically, any and all activity taking place to the left of the due date is preferable; it tends to indicate less procrastination and has the likelihood of involving better time management. | ||
+ | |||
+ | =====Progress By Day (Individual)===== | ||
+ | |||
+ | < | ||
+ | title = sll0 Individual Progress | ||
+ | size = 600x400 | ||
+ | align = center | ||
+ | type = bar | ||
+ | XAxisName = Day | ||
+ | YAxisName = Activity Level | ||
+ | shadow = on | ||
+ | titleColor = #efefef | ||
+ | scaleColor = #efefef | ||
+ | shadowColor = #000 | ||
+ | bggradient = #333@50 | ||
+ | graphGradient = #666@50 | ||
+ | fontLegend = VeraMono.ttf@8 | ||
+ | graphLabels = | ||
+ | |||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | </ | ||
+ | |||
+ | Each line represents an individual class member' | ||
+ | |||
+ | The busier the day looks, the more active a development day it is by more of the class. And the more left shifted the activity, the less procrastination (lefter is betterer). | ||
+ | |||
+ | Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. | ||
+ | |||
+ | NOTE: As of sll2, activity is measured in units of partial project builds. Prior to sll2, only full project builds were counted. | ||
+ | |||
+ | =====Progress By Day and Quantity (Together)===== | ||
+ | |||
+ | < | ||
+ | title = sll0 Class and Quantity Progress | ||
+ | size = 600x400 | ||
+ | align = center | ||
+ | type = barStacked | ||
+ | XAxisName = Day | ||
+ | YAxisName = Activity Level | ||
+ | shadow = on | ||
+ | titleColor = #efefef | ||
+ | scaleColor = #efefef | ||
+ | shadowColor = #000 | ||
+ | bggradient = #333@50 | ||
+ | graphGradient = #666@50 | ||
+ | fontLegend = VeraMono.ttf@8 | ||
+ | graphLabels = | ||
+ | |||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | </ | ||
+ | |||
+ | Each line represents the total class activity on the project for the given day. The higher and more colorful the line, the more activity by more people took place (upperer as well as lefterer is betterer). | ||
+ | |||
+ | Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. | ||
+ | |||
+ | NOTE: Activity is measured in units of partial project builds. Prior to sll2, activity was measured in terms of full project builds. | ||
+ | |||
+ | =====Class Member Activity Per Day===== | ||
+ | |||
+ | < | ||
+ | title = sll0 Class Progress | ||
+ | size = 600x400 | ||
+ | align = center | ||
+ | type = barStacked | ||
+ | XAxisName = Day | ||
+ | YAxisName = Activity Level | ||
+ | shadow = on | ||
+ | titleColor = #efefef | ||
+ | scaleColor = #efefef | ||
+ | shadowColor = #000 | ||
+ | bggradient = #333@50 | ||
+ | graphGradient = #666@50 | ||
+ | fontLegend = VeraMono.ttf@8 | ||
+ | graphLabels = | ||
+ | |||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | 0, | ||
+ | </ | ||
+ | |||
+ | Each day shows the quantity of project builds per day of the project' | ||
+ | |||
+ | Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. As such, the lefterer and upperer the betterer. | ||
+ | |||
+ | NOTE: Activity is measured in units of a user building, and counted once per user per day. | ||
+ | |||
+ | =====Project Lifecycle Stats (Individual)===== | ||
+ | |||
+ | < | ||
+ | title = sll0 Individual Project Duration | ||
+ | size = 600x400 | ||
+ | align = center | ||
+ | type = bar | ||
+ | XAxisName = Person | ||
+ | YAxisName = Minutes | ||
+ | shadow = on | ||
+ | titleColor = #efefef | ||
+ | scaleColor = #efefef | ||
+ | shadowColor = #000 | ||
+ | bggradient = #333@50 | ||
+ | graphGradient = #666@50 | ||
+ | fontLegend = VeraMono.ttf@8 | ||
+ | graphLabels = | ||
+ | |||
+ | 9419 | ||
+ | 8770 | ||
+ | 5880 | ||
+ | 9356 | ||
+ | 10100 | ||
+ | 3272 | ||
+ | 7497 | ||
+ | 11475 | ||
+ | 8447 | ||
+ | 9992 | ||
+ | 2755 | ||
+ | 9025 | ||
+ | 13495 | ||
+ | 12090 | ||
+ | 12259 | ||
+ | 8767 | ||
+ | 0 | ||
+ | 12070 | ||
+ | 10086 | ||
+ | 4318 | ||
+ | </ | ||
+ | |||
+ | Each bar represents the number of minutes taken from initial upgrade to project through project submission (final submission). | ||
+ | |||
+ | Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. | ||
+ | |||
+ | =====Obtains/ | ||
+ | |||
+ | < | ||
+ | title = sll0 Lifecycle Progress | ||
+ | size = 600x400 | ||
+ | align = center | ||
+ | type = barStacked | ||
+ | legendEntries = obtain, upgrade, update, submit | ||
+ | XAxisName = Day | ||
+ | YAxisName = Activity | ||
+ | shadow = on | ||
+ | titleColor = #efefef | ||
+ | scaleColor = #efefef | ||
+ | shadowColor = #000 | ||
+ | bggradient = #333@50 | ||
+ | graphGradient = #666@50 | ||
+ | fontLegend = VeraMono.ttf@8 | ||
+ | graphLabels = | ||
+ | |||
+ | 0, | ||
+ | 60, | ||
+ | 0, | ||
+ | 0, | ||
+ | </ | ||
+ | |||
+ | Each day shows the quantity of project obtains, upgrades, revision updates, and submissions per day of the project' | ||
+ | |||
+ | Although not a guaranteed measure of progress or of success, it is intended as a guage to evaluate how the class as a whole is doing. As such, the lefterer and upperer the betterer. | ||
+ | |||
+ | NOTE: Activity is measured in units of specific actions taken (upgrading, submitting, etc.), and counted once per user per day. | ||
+ | |||
+ | Status Page last updated: Tue Oct 13 16:40:55 EDT 2015 |