| 1 | +# PROJECT: GRADE FIGURE-OUTERER (gfoX) |
|
| 2 | + |
|
| 3 | +## OBJECTIVE |
|
| 4 | + |
|
| 5 | +To successfully obtain, input, calculate, and derive your current overall |
|
| 6 | +status in the course through the use of a spreadsheet calculator. |
|
| 7 | + |
|
| 8 | +## BACKGROUND |
|
| 9 | + |
|
| 10 | +For this project, you will be using **Google Sheets** to create a |
|
| 11 | +spreadsheet and use it to tabulate and compute your current status in the |
|
| 12 | +class. |
|
| 13 | + |
|
| 14 | +You will need a Google account (a personal one is fine; if you use your |
|
| 15 | +school account, be mindful of any sharing restrictions that may apply). |
|
| 16 | +Sheets is accessed through your web browser at: |
|
| 17 | + |
|
| 18 | + * https://sheets.google.com |
|
| 19 | + |
|
| 20 | +No installation is required. You will still use your lab46 account to |
|
| 21 | +look up your results (see LOOK UP YOUR STATUS below), but the spreadsheet |
|
| 22 | +itself is built in the browser. |
|
| 23 | + |
|
| 24 | +## GOOGLE SHEETS BASICS |
|
| 25 | + |
|
| 26 | +If you have never used a spreadsheet before, here is what you need to get |
|
| 27 | +started. Google also has built-in help (Help menu -> Sheets Help) and a |
|
| 28 | +function list (Help -> Function list) you can reference at any time. |
|
| 29 | + |
|
| 30 | +### CELLS AND REFERENCES |
|
| 31 | + |
|
| 32 | +A spreadsheet is a grid of **cells**. Columns are lettered (A, B, C...) |
|
| 33 | +and rows are numbered (1, 2, 3...), so the cell in column B, row 4 is |
|
| 34 | +**B4**. Click a cell to select it, and type to enter data. |
|
| 35 | + |
|
| 36 | + * A cell whose contents start with `=` is a **formula**. |
|
| 37 | + * Formulas can reference other cells: `=B4+B5` |
|
| 38 | + * Formulas can reference a **range** of cells: `=SUM(B4:B9)` |
|
| 39 | + * Formulas update automatically when the cells they reference change. |
|
| 40 | + |
|
| 41 | +### USEFUL FUNCTIONS |
|
| 42 | + |
|
| 43 | +Some functions you will likely find helpful (there are others; explore!): |
|
| 44 | + |
|
| 45 | + * `SUM(range)`: add up all the numbers in a range |
|
| 46 | + * `MIN(a, b)`: the smaller of two values (useful for capping) |
|
| 47 | + * `MAX(a, b)`: the larger of two values |
|
| 48 | + * `ROUND(value, places)`: round to a number of decimal places |
|
| 49 | + * `IF(test, if_true, if_false)`: choose between two results |
|
| 50 | + * `IFS(test1, result1, test2, result2, ...)`: chain multiple tests |
|
| 51 | + * `VLOOKUP(key, range, column, is_sorted)`: look a value up in a table |
|
| 52 | + |
|
| 53 | +### FORMATTING |
|
| 54 | + |
|
| 55 | +Use the toolbar to make your spreadsheet readable: bold headers, borders, |
|
| 56 | +cell background colors, column widths, number formats (such as decimal |
|
| 57 | +places or percent). You can also merge cells for titles (Format -> Merge |
|
| 58 | +cells). |
|
| 59 | + |
|
| 60 | +### SAVING |
|
| 61 | + |
|
| 62 | +Google Sheets **saves automatically** as you work. Give your spreadsheet |
|
| 63 | +a meaningful name by clicking the title at the top left of the page (for |
|
| 64 | +example: `gfo0`). |
|
| 65 | + |
|
| 66 | +See the SUBMISSION section for how to get your finished work to me. |
|
| 67 | + |
|
| 68 | +## LOOK UP YOUR STATUS |
|
| 69 | + |
|
| 70 | +Ever since the first projects came due and were evaluated, your results |
|
| 71 | +were accessible to you on lab46 via the **status** command. |
|
| 72 | + |
|
| 73 | +The synopsis for the **status** command is: |
|
| 74 | + |
|
| 75 | +``` |
|
| 76 | +status DESIG [OPTION..] |
|
| 77 | +``` |
|
| 78 | + |
|
| 79 | +Where OPTION is any valid presence and combination of viable options |
|
| 80 | +(**detail** is one, **help** is another). |
|
| 81 | + |
|
| 82 | +The most common usage will probably be (square brackets in this context |
|
| 83 | +denote optionality): |
|
| 84 | + |
|
| 85 | +``` |
|
| 86 | +status DESIG [detail] |
|
| 87 | +``` |
|
| 88 | + |
|
| 89 | +Customize per the desired request. If you do not want the detailed view, |
|
| 90 | +omit the `detail` option. If you desire it, include the `detail` option. |
|
| 91 | + |
|
| 92 | +NOTE: **status** and the data it reads from are only accessible on lab46. |
|
| 93 | + |
|
| 94 | +``` |
|
| 95 | +lab46:~$ status DESIG |
|
| 96 | +``` |
|
| 97 | + |
|
| 98 | +Furthermore, if you were curious about the breakdown of points, you could |
|
| 99 | +also append the 'detail' argument to get an expanded view of information: |
|
| 100 | + |
|
| 101 | +``` |
|
| 102 | +lab46:~$ status DESIG detail |
|
| 103 | +``` |
|
| 104 | + |
|
| 105 | +NOTE: because 'detail' is an optional argument we use the square brackets |
|
| 106 | +to denote optionality. You do not type them, instead, you either type |
|
| 107 | +what is in them, or you do not, depending on desired functionality. |
|
| 108 | + |
|
| 109 | +## CALCULATING YOUR GRADE |
|
| 110 | + |
|
| 111 | +Your grade is calculated from four distinct components, three of which |
|
| 112 | +you regularly encounter each week through the semester, and the final one |
|
| 113 | +at the end. Each is worth a certain amount of overall points, that when |
|
| 114 | +added up equals 104 points. With their individual point values, they are: |
|
| 115 | + |
|
| 116 | + * projects (52 points) |
|
| 117 | + * notes (13 points) |
|
| 118 | + * participation (13 points) |
|
| 119 | + * eoce (26 points) |
|
| 120 | + |
|
| 121 | +Within each category, you tally up two different accumulations of points: |
|
| 122 | + |
|
| 123 | + * all the points YOU got |
|
| 124 | + * all the points POSSIBLE to get |
|
| 125 | + |
|
| 126 | +Each category (and the overall grade) is evaluated as a sum of points |
|
| 127 | +earned out of a sum of points possible (NOT an average of averages). |
|
| 128 | + |
|
| 129 | +For example, take this sample participation dataset: |
|
| 130 | + |
|
| 131 | +``` |
|
| 132 | +1:wcp1:final tally of results (1/1) |
|
| 133 | +2:wcp2:final tally of results (2/2) |
|
| 134 | +1:wcp3:final tally of results (1/4) |
|
| 135 | +5:wcp4:final tally of results (5/8) |
|
| 136 | +4:moar:final tally of results (4/0) |
|
| 137 | +``` |
|
| 138 | + |
|
| 139 | +This person got 1+2+1+5 points (and 4 bonus points), for a total of: 9 + |
|
| 140 | +4 = 13 points. |
|
| 141 | + |
|
| 142 | +The total amount of points available (at this point) was 1+2+4+8+0, or: |
|
| 143 | +15 points |
|
| 144 | + |
|
| 145 | +A note on 'bonus' points: in each category, there is the potential for |
|
| 146 | +the accumulation of bonus/extra/moar points. These are added into the |
|
| 147 | +mix, BUT for the purposes of grading, the final tally of YOUR points can |
|
| 148 | +NOT exceed the final tally of total points (bonus points only pad the |
|
| 149 | +category in which they were earned, and only up to that category's |
|
| 150 | +maximum). |
|
| 151 | + |
|
| 152 | +In this case, the person amassed 13 total points, out of a total of 15 |
|
| 153 | +points: for purposes of grading, for their participation score, it would |
|
| 154 | +be 13/15. Bonus points only apply to the particular category in which |
|
| 155 | +they were earned (they cannot be applied to a different category). |
|
| 156 | + |
|
| 157 | +Continuing this example, the person got 13/15ths of the 13 available |
|
| 158 | +points for that section (participation is worth 13 total points). We |
|
| 159 | +would calculate that "out of 13" result as follows: |
|
| 160 | + |
|
| 161 | +`(13/15)*13` = 11 (so at this point, they'd have 11 out of 13 |
|
| 162 | +participation points) |
|
| 163 | + |
|
| 164 | +Do the same for projects (52) and notes (13). For now, the total possible |
|
| 165 | +grade points you can receive is 78 total points (52+13+13). So that is |
|
| 166 | +what your spreadsheet should reflect. (EoCE does not exist yet, so it is |
|
| 167 | +not part of this calculation.) |
|
| 168 | + |
|
| 169 | +### LETTER GRADES |
|
| 170 | + |
|
| 171 | +Your letter grade is obtained by determining your score (out of 100) and |
|
| 172 | +selecting the letter grade pertaining to that value. Letter grades are |
|
| 173 | +pegged to the following numeric values (per the course syllabus): |
|
| 174 | + |
|
| 175 | +``` |
|
| 176 | +A 98.00+ |
|
| 177 | +A- 92.00 - 97.99 |
|
| 178 | +B+ 86.00 - 91.99 |
|
| 179 | +B 80.00 - 85.99 |
|
| 180 | +B- 74.00 - 79.99 |
|
| 181 | +C+ 68.00 - 73.99 |
|
| 182 | +C 62.00 - 67.99 |
|
| 183 | +D 56.00 - 61.99 |
|
| 184 | +F 0.00 - 55.99 |
|
| 185 | +``` |
|
| 186 | + |
|
| 187 | +Your score out of 100 is your current points out of 78, scaled to 100: |
|
| 188 | +`(your points / 78) * 100`. |
|
| 189 | + |
|
| 190 | +## SPREADSHEET |
|
| 191 | + |
|
| 192 | +For this project, your task is to make a spreadsheet in Google |
|
| 193 | +Sheets that, in clearly readable and organized fashion, plots out your |
|
| 194 | +various results on the different deliverables for the class, ultimately |
|
| 195 | +displaying your current overall grade for the course. |
|
| 196 | + |
|
| 197 | +I want to see each project (identified), along with the points you got, |
|
| 198 | +along with the total points possible for a "dashboard" quick glance, |
|
| 199 | +calculate your project "score" out of 100 (just to give you a feel for |
|
| 200 | +how you did on a particular project). Be sure to: |
|
| 201 | + |
|
| 202 | + * have a category for bonus points you have earned |
|
| 203 | + * have a projects score tally (all your points earned) |
|
| 204 | + * have a projects total tally (all the points possible to earn) |
|
| 205 | + |
|
| 206 | +Calculate your projects "score" out of 100 (just to give you a feel for |
|
| 207 | +how you did on the category overall). |
|
| 208 | + |
|
| 209 | +Calculate your projects "points" (out of 52), and display it under an |
|
| 210 | +identifiable label. |
|
| 211 | + |
|
| 212 | +Do the same for the participation and notes categories as well. |
|
| 213 | + |
|
| 214 | +Add up your category points (52+13+13=78), and have these be near each |
|
| 215 | +other in your spreadsheet. |
|
| 216 | + |
|
| 217 | +Calculate your actual current score for the class (based on a total of 78 |
|
| 218 | +points), and use a spreadsheet function (such as IFS or VLOOKUP) to |
|
| 219 | +determine from the letter grade ladder where you fall, displaying the |
|
| 220 | +resulting letter grade. |
|
| 221 | + |
|
| 222 | +Do NOTE: the aim and spirit of this project is to use the SPREADSHEET as |
|
| 223 | +the calculator. I want to see embedded equations, NOT pre-calculated |
|
| 224 | +values in your spreadsheet data. I do NOT want to see you being the |
|
| 225 | +calculator, pre-calculating all the values, and just entering them. That |
|
| 226 | +is NOT effective use of the spreadsheet. |
|
| 227 | + |
|
| 228 | +If you'd like to continue using this spreadsheet for additional points |
|
| 229 | +accrued in the coming weeks, you may want to plan ahead and set up your |
|
| 230 | +"final results" tally with some space away from the growing list of |
|
| 231 | +results (or on its own tab). Using ranges that have room to grow (for |
|
| 232 | +example, `SUM(B2:B30)`) can save you from having to rewrite formulas |
|
| 233 | +later. |
|
| 234 | + |
|
| 235 | +## TIME-SENSITIVE DATA |
|
| 236 | + |
|
| 237 | +gfoX is issued twice during the semester, and each iteration is to |
|
| 238 | +capture the following snapshot of data in its reporting results: |
|
| 239 | + |
|
| 240 | + * gfo0: start of semester through and including week 6 deliverables |
|
| 241 | + * gfo1: start of semester through and including week 12 deliverables |
|
| 242 | + |
|
| 243 | +There is a bit of a lag from the end of the sampling window and when that |
|
| 244 | +project is due: |
|
| 245 | + |
|
| 246 | + * gfo0 (through week 6 data) will be due alongside pct9/wcp9 |
|
| 247 | + * gfo1 (through week 12 data) will be due alongside pctE/wcpE |
|
| 248 | + |
|
| 249 | +Each iteration is a fresh snapshot: gfo1 should include everything from |
|
| 250 | +gfo0 plus the weeks since (weeks 1-12 in total). You are welcome to build |
|
| 251 | +gfo1 by copying your gfo0 spreadsheet and extending it (in Google Sheets: |
|
| 252 | +File -> Make a copy), as long as the final result is correct for the full |
|
| 253 | +week 1-12 window. |
|
| 254 | + |
|
| 255 | +## SUBMISSION |
|
| 256 | + |
|
| 257 | +To successfully complete this project, the following criteria must be |
|
| 258 | +met: |
|
| 259 | + |
|
| 260 | + * Solution must utilize the algorithm/approach presented above |
|
| 261 | + * Output must conform to the specifications presented above |
|
| 262 | + * Submit your solution by committing it to your private semester |
|
| 263 | + repository (NOT via the lab46 **submit** tool). |
|
| 264 | + |
|
| 265 | +Your finished spreadsheet needs to be exported from Google Sheets in a |
|
| 266 | +format that preserves your formulas, and then placed in the gfoX project |
|
| 267 | +directory of your private semester repository: |
|
| 268 | + |
|
| 269 | + 1. In Google Sheets, choose **File -> Download -> Microsoft Excel |
|
| 270 | + (.xlsx)**. Name/rename the downloaded file `gfoX.xlsx` |
|
| 271 | + (substituting the actual iteration, such as `gfo0.xlsx` or |
|
| 272 | + `gfo1.xlsx`). |
|
| 273 | + 2. Place the file in the corresponding project directory of your |
|
| 274 | + private semester repository (the same place you would put other |
|
| 275 | + project deliverables). |
|
| 276 | + 3. Add, commit, and push it. |
|
| 277 | + |
|
| 278 | +NOTE: do NOT download as CSV. CSV files contain only the displayed values |
|
| 279 | +and discard your formulas, which would defeat the purpose of the project. |
|
| 280 | + |
|
| 281 | +Be sure the push completes without errors, and verify that your file |
|
| 282 | +shows up in your repository. If not, check for typos and or locational |
|
| 283 | +mismatches (wrong directory, wrong filename, forgetting to push). |
|
| 284 | + |
|
| 285 | +Your submission is evaluated as of the project's due date, so be sure to |
|
| 286 | +push before the deadline (the late policy applies as usual). |
|
| 287 | + |
|
| 288 | +It is also a good idea to keep your Google Sheet itself as a backup. |
|
| 289 | + |
|
| 290 | +### RUBRIC |
|
| 291 | + |
|
| 292 | +What I will be looking for: |
|
| 293 | + |
|
| 294 | +``` |
|
| 295 | +52:gfoX:final tally of results (52/52) |
|
| 296 | +*:gfoX:gfoX.xlsx data points entered as numbers, adequately labelled [13/13] |
|
| 297 | +*:gfoX:gfoX.xlsx all calculations done as equations in spreadsheet [13/13] |
|
| 298 | +*:gfoX:gfoX.xlsx calculations reference cells, NOT literal data [13/13] |
|
| 299 | +*:gfoX:gfoX.xlsx calculations use available spreadsheet functions [13/13] |
|
| 300 | +``` |
|
| 301 | + |
|
| 302 | +Additionally: |
|
| 303 | + * Solutions not abiding by **SPIRIT** of project will be subject to a 25% overall deduction |
|
| 304 | + * Solution output lacking **ORGANIZATION** or not easy to read (fits on a standard screen without excessive scrolling, clear labels and formatting) are subject to a 25% overall deduction |
haas/fall2026/c4eng/projects/gfoX.md
| ... | ... | @@ -1,304 +0,0 @@ |
| 1 | -# PROJECT: GRADE FIGURE-OUTERER (gfoX) |
|
| 2 | - |
|
| 3 | -## OBJECTIVE |
|
| 4 | - |
|
| 5 | -To successfully obtain, input, calculate, and derive your current overall |
|
| 6 | -status in the course through the use of a spreadsheet calculator. |
|
| 7 | - |
|
| 8 | -## BACKGROUND |
|
| 9 | - |
|
| 10 | -For this project, you will be using **Google Sheets** to create a |
|
| 11 | -spreadsheet and use it to tabulate and compute your current status in the |
|
| 12 | -class. |
|
| 13 | - |
|
| 14 | -You will need a Google account (a personal one is fine; if you use your |
|
| 15 | -school account, be mindful of any sharing restrictions that may apply). |
|
| 16 | -Sheets is accessed through your web browser at: |
|
| 17 | - |
|
| 18 | - * https://sheets.google.com |
|
| 19 | - |
|
| 20 | -No installation is required. You will still use your lab46 account to |
|
| 21 | -look up your results (see LOOK UP YOUR STATUS below), but the spreadsheet |
|
| 22 | -itself is built in the browser. |
|
| 23 | - |
|
| 24 | -## GOOGLE SHEETS BASICS |
|
| 25 | - |
|
| 26 | -If you have never used a spreadsheet before, here is what you need to get |
|
| 27 | -started. Google also has built-in help (Help menu -> Sheets Help) and a |
|
| 28 | -function list (Help -> Function list) you can reference at any time. |
|
| 29 | - |
|
| 30 | -### CELLS AND REFERENCES |
|
| 31 | - |
|
| 32 | -A spreadsheet is a grid of **cells**. Columns are lettered (A, B, C...) |
|
| 33 | -and rows are numbered (1, 2, 3...), so the cell in column B, row 4 is |
|
| 34 | -**B4**. Click a cell to select it, and type to enter data. |
|
| 35 | - |
|
| 36 | - * A cell whose contents start with `=` is a **formula**. |
|
| 37 | - * Formulas can reference other cells: `=B4+B5` |
|
| 38 | - * Formulas can reference a **range** of cells: `=SUM(B4:B9)` |
|
| 39 | - * Formulas update automatically when the cells they reference change. |
|
| 40 | - |
|
| 41 | -### USEFUL FUNCTIONS |
|
| 42 | - |
|
| 43 | -Some functions you will likely find helpful (there are others; explore!): |
|
| 44 | - |
|
| 45 | - * `SUM(range)`: add up all the numbers in a range |
|
| 46 | - * `MIN(a, b)`: the smaller of two values (useful for capping) |
|
| 47 | - * `MAX(a, b)`: the larger of two values |
|
| 48 | - * `ROUND(value, places)`: round to a number of decimal places |
|
| 49 | - * `IF(test, if_true, if_false)`: choose between two results |
|
| 50 | - * `IFS(test1, result1, test2, result2, ...)`: chain multiple tests |
|
| 51 | - * `VLOOKUP(key, range, column, is_sorted)`: look a value up in a table |
|
| 52 | - |
|
| 53 | -### FORMATTING |
|
| 54 | - |
|
| 55 | -Use the toolbar to make your spreadsheet readable: bold headers, borders, |
|
| 56 | -cell background colors, column widths, number formats (such as decimal |
|
| 57 | -places or percent). You can also merge cells for titles (Format -> Merge |
|
| 58 | -cells). |
|
| 59 | - |
|
| 60 | -### SAVING |
|
| 61 | - |
|
| 62 | -Google Sheets **saves automatically** as you work. Give your spreadsheet |
|
| 63 | -a meaningful name by clicking the title at the top left of the page (for |
|
| 64 | -example: `gfo0`). |
|
| 65 | - |
|
| 66 | -See the SUBMISSION section for how to get your finished work to me. |
|
| 67 | - |
|
| 68 | -## LOOK UP YOUR STATUS |
|
| 69 | - |
|
| 70 | -Ever since the first projects came due and were evaluated, your results |
|
| 71 | -were accessible to you on lab46 via the **status** command. |
|
| 72 | - |
|
| 73 | -The synopsis for the **status** command is: |
|
| 74 | - |
|
| 75 | -``` |
|
| 76 | -status DESIG [OPTION..] |
|
| 77 | -``` |
|
| 78 | - |
|
| 79 | -Where OPTION is any valid presence and combination of viable options |
|
| 80 | -(**detail** is one, **help** is another). |
|
| 81 | - |
|
| 82 | -The most common usage will probably be (square brackets in this context |
|
| 83 | -denote optionality): |
|
| 84 | - |
|
| 85 | -``` |
|
| 86 | -status DESIG [detail] |
|
| 87 | -``` |
|
| 88 | - |
|
| 89 | -Customize per the desired request. If you do not want the detailed view, |
|
| 90 | -omit the `detail` option. If you desire it, include the `detail` option. |
|
| 91 | - |
|
| 92 | -NOTE: **status** and the data it reads from are only accessible on lab46. |
|
| 93 | - |
|
| 94 | -``` |
|
| 95 | -lab46:~$ status DESIG |
|
| 96 | -``` |
|
| 97 | - |
|
| 98 | -Furthermore, if you were curious about the breakdown of points, you could |
|
| 99 | -also append the 'detail' argument to get an expanded view of information: |
|
| 100 | - |
|
| 101 | -``` |
|
| 102 | -lab46:~$ status DESIG detail |
|
| 103 | -``` |
|
| 104 | - |
|
| 105 | -NOTE: because 'detail' is an optional argument we use the square brackets |
|
| 106 | -to denote optionality. You do not type them, instead, you either type |
|
| 107 | -what is in them, or you do not, depending on desired functionality. |
|
| 108 | - |
|
| 109 | -## CALCULATING YOUR GRADE |
|
| 110 | - |
|
| 111 | -Your grade is calculated from four distinct components, three of which |
|
| 112 | -you regularly encounter each week through the semester, and the final one |
|
| 113 | -at the end. Each is worth a certain amount of overall points, that when |
|
| 114 | -added up equals 104 points. With their individual point values, they are: |
|
| 115 | - |
|
| 116 | - * projects (52 points) |
|
| 117 | - * notes (13 points) |
|
| 118 | - * participation (13 points) |
|
| 119 | - * eoce (26 points) |
|
| 120 | - |
|
| 121 | -Within each category, you tally up two different accumulations of points: |
|
| 122 | - |
|
| 123 | - * all the points YOU got |
|
| 124 | - * all the points POSSIBLE to get |
|
| 125 | - |
|
| 126 | -Each category (and the overall grade) is evaluated as a sum of points |
|
| 127 | -earned out of a sum of points possible (NOT an average of averages). |
|
| 128 | - |
|
| 129 | -For example, take this sample participation dataset: |
|
| 130 | - |
|
| 131 | -``` |
|
| 132 | -1:wcp1:final tally of results (1/1) |
|
| 133 | -2:wcp2:final tally of results (2/2) |
|
| 134 | -1:wcp3:final tally of results (1/4) |
|
| 135 | -5:wcp4:final tally of results (5/8) |
|
| 136 | -4:moar:final tally of results (4/0) |
|
| 137 | -``` |
|
| 138 | - |
|
| 139 | -This person got 1+2+1+5 points (and 4 bonus points), for a total of: 9 + |
|
| 140 | -4 = 13 points. |
|
| 141 | - |
|
| 142 | -The total amount of points available (at this point) was 1+2+4+8+0, or: |
|
| 143 | -15 points |
|
| 144 | - |
|
| 145 | -A note on 'bonus' points: in each category, there is the potential for |
|
| 146 | -the accumulation of bonus/extra/moar points. These are added into the |
|
| 147 | -mix, BUT for the purposes of grading, the final tally of YOUR points can |
|
| 148 | -NOT exceed the final tally of total points (bonus points only pad the |
|
| 149 | -category in which they were earned, and only up to that category's |
|
| 150 | -maximum). |
|
| 151 | - |
|
| 152 | -In this case, the person amassed 13 total points, out of a total of 15 |
|
| 153 | -points: for purposes of grading, for their participation score, it would |
|
| 154 | -be 13/15. Bonus points only apply to the particular category in which |
|
| 155 | -they were earned (they cannot be applied to a different category). |
|
| 156 | - |
|
| 157 | -Continuing this example, the person got 13/15ths of the 13 available |
|
| 158 | -points for that section (participation is worth 13 total points). We |
|
| 159 | -would calculate that "out of 13" result as follows: |
|
| 160 | - |
|
| 161 | -`(13/15)*13` = 11 (so at this point, they'd have 11 out of 13 |
|
| 162 | -participation points) |
|
| 163 | - |
|
| 164 | -Do the same for projects (52) and notes (13). For now, the total possible |
|
| 165 | -grade points you can receive is 78 total points (52+13+13). So that is |
|
| 166 | -what your spreadsheet should reflect. (EoCE does not exist yet, so it is |
|
| 167 | -not part of this calculation.) |
|
| 168 | - |
|
| 169 | -### LETTER GRADES |
|
| 170 | - |
|
| 171 | -Your letter grade is obtained by determining your score (out of 100) and |
|
| 172 | -selecting the letter grade pertaining to that value. Letter grades are |
|
| 173 | -pegged to the following numeric values (per the course syllabus): |
|
| 174 | - |
|
| 175 | -``` |
|
| 176 | -A 98.00+ |
|
| 177 | -A- 92.00 - 97.99 |
|
| 178 | -B+ 86.00 - 91.99 |
|
| 179 | -B 80.00 - 85.99 |
|
| 180 | -B- 74.00 - 79.99 |
|
| 181 | -C+ 68.00 - 73.99 |
|
| 182 | -C 62.00 - 67.99 |
|
| 183 | -D 56.00 - 61.99 |
|
| 184 | -F 0.00 - 55.99 |
|
| 185 | -``` |
|
| 186 | - |
|
| 187 | -Your score out of 100 is your current points out of 78, scaled to 100: |
|
| 188 | -`(your points / 78) * 100`. |
|
| 189 | - |
|
| 190 | -## SPREADSHEET |
|
| 191 | - |
|
| 192 | -For this project, your task is to make a spreadsheet in Google |
|
| 193 | -Sheets that, in clearly readable and organized fashion, plots out your |
|
| 194 | -various results on the different deliverables for the class, ultimately |
|
| 195 | -displaying your current overall grade for the course. |
|
| 196 | - |
|
| 197 | -I want to see each project (identified), along with the points you got, |
|
| 198 | -along with the total points possible for a "dashboard" quick glance, |
|
| 199 | -calculate your project "score" out of 100 (just to give you a feel for |
|
| 200 | -how you did on a particular project). Be sure to: |
|
| 201 | - |
|
| 202 | - * have a category for bonus points you have earned |
|
| 203 | - * have a projects score tally (all your points earned) |
|
| 204 | - * have a projects total tally (all the points possible to earn) |
|
| 205 | - |
|
| 206 | -Calculate your projects "score" out of 100 (just to give you a feel for |
|
| 207 | -how you did on the category overall). |
|
| 208 | - |
|
| 209 | -Calculate your projects "points" (out of 52), and display it under an |
|
| 210 | -identifiable label. |
|
| 211 | - |
|
| 212 | -Do the same for the participation and notes categories as well. |
|
| 213 | - |
|
| 214 | -Add up your category points (52+13+13=78), and have these be near each |
|
| 215 | -other in your spreadsheet. |
|
| 216 | - |
|
| 217 | -Calculate your actual current score for the class (based on a total of 78 |
|
| 218 | -points), and use a spreadsheet function (such as IFS or VLOOKUP) to |
|
| 219 | -determine from the letter grade ladder where you fall, displaying the |
|
| 220 | -resulting letter grade. |
|
| 221 | - |
|
| 222 | -Do NOTE: the aim and spirit of this project is to use the SPREADSHEET as |
|
| 223 | -the calculator. I want to see embedded equations, NOT pre-calculated |
|
| 224 | -values in your spreadsheet data. I do NOT want to see you being the |
|
| 225 | -calculator, pre-calculating all the values, and just entering them. That |
|
| 226 | -is NOT effective use of the spreadsheet. |
|
| 227 | - |
|
| 228 | -If you'd like to continue using this spreadsheet for additional points |
|
| 229 | -accrued in the coming weeks, you may want to plan ahead and set up your |
|
| 230 | -"final results" tally with some space away from the growing list of |
|
| 231 | -results (or on its own tab). Using ranges that have room to grow (for |
|
| 232 | -example, `SUM(B2:B30)`) can save you from having to rewrite formulas |
|
| 233 | -later. |
|
| 234 | - |
|
| 235 | -## TIME-SENSITIVE DATA |
|
| 236 | - |
|
| 237 | -gfoX is issued twice during the semester, and each iteration is to |
|
| 238 | -capture the following snapshot of data in its reporting results: |
|
| 239 | - |
|
| 240 | - * gfo0: start of semester through and including week 6 deliverables |
|
| 241 | - * gfo1: start of semester through and including week 12 deliverables |
|
| 242 | - |
|
| 243 | -There is a bit of a lag from the end of the sampling window and when that |
|
| 244 | -project is due: |
|
| 245 | - |
|
| 246 | - * gfo0 (through week 6 data) will be due alongside pct9/wcp9 |
|
| 247 | - * gfo1 (through week 12 data) will be due alongside pctE/wcpE |
|
| 248 | - |
|
| 249 | -Each iteration is a fresh snapshot: gfo1 should include everything from |
|
| 250 | -gfo0 plus the weeks since (weeks 1-12 in total). You are welcome to build |
|
| 251 | -gfo1 by copying your gfo0 spreadsheet and extending it (in Google Sheets: |
|
| 252 | -File -> Make a copy), as long as the final result is correct for the full |
|
| 253 | -week 1-12 window. |
|
| 254 | - |
|
| 255 | -## SUBMISSION |
|
| 256 | - |
|
| 257 | -To successfully complete this project, the following criteria must be |
|
| 258 | -met: |
|
| 259 | - |
|
| 260 | - * Solution must utilize the algorithm/approach presented above |
|
| 261 | - * Output must conform to the specifications presented above |
|
| 262 | - * Submit your solution by committing it to your private semester |
|
| 263 | - repository (NOT via the lab46 **submit** tool). |
|
| 264 | - |
|
| 265 | -Your finished spreadsheet needs to be exported from Google Sheets in a |
|
| 266 | -format that preserves your formulas, and then placed in the gfoX project |
|
| 267 | -directory of your private semester repository: |
|
| 268 | - |
|
| 269 | - 1. In Google Sheets, choose **File -> Download -> Microsoft Excel |
|
| 270 | - (.xlsx)**. Name/rename the downloaded file `gfoX.xlsx` |
|
| 271 | - (substituting the actual iteration, such as `gfo0.xlsx` or |
|
| 272 | - `gfo1.xlsx`). |
|
| 273 | - 2. Place the file in the corresponding project directory of your |
|
| 274 | - private semester repository (the same place you would put other |
|
| 275 | - project deliverables). |
|
| 276 | - 3. Add, commit, and push it. |
|
| 277 | - |
|
| 278 | -NOTE: do NOT download as CSV. CSV files contain only the displayed values |
|
| 279 | -and discard your formulas, which would defeat the purpose of the project. |
|
| 280 | - |
|
| 281 | -Be sure the push completes without errors, and verify that your file |
|
| 282 | -shows up in your repository. If not, check for typos and or locational |
|
| 283 | -mismatches (wrong directory, wrong filename, forgetting to push). |
|
| 284 | - |
|
| 285 | -Your submission is evaluated as of the project's due date, so be sure to |
|
| 286 | -push before the deadline (the late policy applies as usual). |
|
| 287 | - |
|
| 288 | -It is also a good idea to keep your Google Sheet itself as a backup. |
|
| 289 | - |
|
| 290 | -### RUBRIC |
|
| 291 | - |
|
| 292 | -What I will be looking for: |
|
| 293 | - |
|
| 294 | -``` |
|
| 295 | -52:gfoX:final tally of results (52/52) |
|
| 296 | -*:gfoX:gfoX.xlsx data points entered as numbers, adequately labelled [13/13] |
|
| 297 | -*:gfoX:gfoX.xlsx all calculations done as equations in spreadsheet [13/13] |
|
| 298 | -*:gfoX:gfoX.xlsx calculations reference cells, NOT literal data [13/13] |
|
| 299 | -*:gfoX:gfoX.xlsx calculations use available spreadsheet functions [13/13] |
|
| 300 | -``` |
|
| 301 | - |
|
| 302 | -Additionally: |
|
| 303 | - * Solutions not abiding by **SPIRIT** of project will be subject to a 25% overall deduction |
|
| 304 | - * Solution output lacking **ORGANIZATION** or not easy to read (fits on a standard screen without excessive scrolling, clear labels and formatting) are subject to a 25% overall deduction |