Mike Gough & Jamie Brandt
Rearrange the computers. organize the wiring, and document the layout of the student.lab shelving area.
Tidieness is next to godliness they say, well if that were the case, the lab shelves would be “down below” as they say (No offense to anybody that worked on it before!).
The servers were re-ordered per Matt's instructions with a total de-wiring of the entire shelving area. We attached the power strips to the back of the shelves in more suitable locations for cabling purposes.
The cabling routing was changed and all cables were wire-tied and organized.
My goal is to put up an autocad drawing of the wall, but I've ran into technical export issues. Here is the final layout
Server KVM /Port switch/port Power source
Top shelf
UPS wall power Lamarr 0/3 5 port switch ups ahhcobras 0/2 5 port switch ups koolaid 0/1 5 port switch ups 5 port switch ups
Second shelf
KVM 0 Strip 0 KVM 1 Strip 0 Switch 0 Port 23 connected to koolaid Strip 0
Third shelf
VM1 1 / 5 0 / 1 Strip 1 VM2 1 / 6 0 / 2 Strip 1 VM3 1 / 7 0 / 3 Strip 1 VM4 1 / 8 0 / 4 Strip 1
Bottom shelf
VM5 0 / 5 0 / 5 Strip 2 VM6 0 / 6 0 / 6 Strip 2 VM7 0 / 7 0 / 7 Strip 2 VM8 0 / 8 0 / 8 Strip 2
Top shelf C00 2 / 1 1 / 1 C01 2 / 2 1 / 2 C02 2 / 3 1 / 3 C03 2 / 4 1 / 4
Second shelf
KVM02 KVM03 Switch 1
Third shelf
C04 2 / 5 1 / 5 C05 2 / 6 1 / 6 C06 2 / 7 1 / 7 C07 2 / 8 1 / 8
Forth shelf
G0 3 / 8 1 / 9 G1 3 / 7 1 / 10 G2 3 / 6 1 / 11 G3 3 / 5 1 / 12
Fifth shelf
S10 3 / 3 1 / 16 GS 3 / 4 g