Table of Contents

C for Engineers Fall 2024 Status

Data and visualizations generated from class activity.

This information is provided to give you a better perspective on how the class as a whole is trending.

Numeric Stats on Deliverables

==================================================================================
C4ENG     pct2 abc0 gtf0  got+bns/totl tlly prjct+prtcp+jrnal=results ( grade )
==================================================================================
 lowscore:   0    0    0 ............. 0.0% ......................... ( 15.276)
 avgscore:  43   63   55 .............  68% ......................... ( 64.783)
   median:   0   69   74 .............  70% ......................... ( 88.460)
  hiscore: 100  100  100 ............. 125% ......................... (155.128)
     mode:   0   69  100 
    range: 100  100  100 
==================================================================================
 # passed:   7   12    9 .............    8 ......................... 11 ( 73%)
  # of As:   5    4    5 .............    5 .........................  6 ( 40%)
  # of Bs:   1    0    0 .............    2 .........................  3 ( 20%)
  # of Cs:   1    8    4 .............    1 .........................  0 (  0%)
  # of Ds:   0    0    0 .............    0 .........................  2 ( 13%)
  # of Fs:   8    3    6 .............    7 .........................  4 ( 26%)
 # submit:   6   12    8 
  # early:   5   10    3 
  # onday:   1    2    5 
   # late:   1    1    3 
# missing:   9    4    5 
 % passed:  46%  80%  60%
  % of As:  33%  26%  33%
  % of Bs:   6%   0%   0%
  % of Cs:   6%  53%  26%
  % of Ds:   0%   0%   0%
  % of Fs:  53%  20%  40%
 % submit:  40%  80%  53%
  % early:  33%  66%  20%
  % onday:   6%  13%  33%
   % late:   6%   6%  20%
% missing:  60%  26%  33%
==================================================================================

Class Project Progress

Of the various all-class metrics we can analyze:

We can visualize the results to gain a big picture view. The more the data stays within a certain range, the less interesting the graphs will appear. In such cases, boring graphs indicate the class as a whole is staying relatively the same with respect to that metric (dips would tend to indicate problems, rises would tend to indicate improvements).

Project Metrics

Project Metrics graph

Class Ranking

Project Ranking graph